Welcome to Refwin.com Sign In Join Free Home Inquiry Contact Mobile Publications Free E-Weekly News
  • Directory
  • Price
  • Market
  • Buy
  • News
  • Calendar
  • Dictionary
Company News Industry News Refwin in the News Home > News

Calderys Completed Biomass – Zaragoza Project

2012-11-27

Nov. 26, 2012 - Calderys has recently completed a turnkey installation of the refractory lining for a 130 MW, biomass-fired CFB in Spain for a major Scandinavian boiler manufacturer. This project is the most recent addition to the Calderys portfolio of successes in the global biomass power industry. Located adjacent to an associated paper mill, this boiler will burn a combination of paper mill waste and domestic waste from the town of Zaragoza to provide electricity and some steam to the paper mill.
For this project, Calderys turnkey installation services included:
Design and Engineering:

Lining design and material selection:
Thin refractory lining on tube-walls with thicknesses varying from 30 to 60 mm top of tube for this highly efficient WTE (waste-to-energy) system.
For vertical walls our self-flowing castables have been preferred to ensure a perfect filling.
Very high Alkali resistant products, designed for biomass & incinerators, have been chosen: CALDE™ FLOW LF 50 A for the lower furnace, wall and cone of the cyclone and loop seal. Where excellent abrasion resistance is needed, in addition to alkali resistance, our CALDE™ FLOW LM 74 A has been installed into such parts as the cyclone inlet and cyclone target wall (with offset joints between the panels to minimize the abrasion of the joints).
For the roofs LPGM (Low Porosity Gunning Materials), dense gunning castables, have been installed: CALDE™ GUN LS 30 for furnace roof, CALDE™ GUN LB 85 for cyclone roof, and CALDE™ GUN LF 52 A in other roofs. CALDE™ STIX PB 85 has ensured the junction between roofs and walls.
The upper furnace walls and wing walls required a very thin lining of 30 mm top of tube with a product presenting a very high heat transfer, therefore a phosphate bonded 85 % Silicon Carbide ramming has been installed: Keraplan SiC V-85-E, thanks to its numerous references.
Thermal calculations, bill of materials, and installation design drawings.
Material Supply: global network of manufacturing plants featuring rigorous quality control, customized packing and marking, and logistics services including partial deliveries to avoid storage problems on site.
Site Management: installation procedures and quality control, health and safety management, and installation progress tracking and reporting every day to the OEM representative by our site manager.
Comprehensive Installation Services – equipment supply, labor, supervision, dry-out, method statements and manpower planning, and onsite testing.
Commissioning – as-built drawings, operation manual, completion certificate, and warrantee.
Inside view of the combustion chamber with burners' blocks, from bottom.
The unique ability of Calderys to offer single sourcing for projects of this type has been recognized and utilized with great success by OEM’s, EPC’s, installation contractors, and end-users around the globe. Recent biomass projects have included circulating fluidized bed, bubbling bed, and traveling grate boilers.
As the world leader in monolithic refractories, Calderys continues to develop not only innovative refractory products, but innovative refractory solutions.

About Us Site Map Service Our Partners Links Inquiry Contact FAQ Privacy Statement Technical Support

Sponsored by: ACRI (The Association of China Refractories Industry), Tangshan YinNaiLian E-Business Co., Ltd.

Copyright © 2005-2020 Refractories Window All Rights Reserved

Tel: +86-315-5918500 Fax: +86-315-5918828 Email: info@refwin.com

ICP经营许可证编号: 冀B2-20060049 ICP备案号: 冀ICP备17015545号

冀公网安备 13024002000198号 营业执照