Welcome to Refwin.com Sign In Join Free Home Inquiry Contact Mobile Publications Free E-Weekly News
  • Directory
  • Price
  • Market
  • Buy
  • News
  • Calendar
  • Dictionary
Company News Industry News Refwin in the News Home > News

The Maintenance Project For NO.2 BF of Jiangsu Xingda Iron& Steel Co., LTD.

2017-09-18

In recent days Henan Huaxi Furnace Refractory Co.,LTD. (Huaxi Refratory) make a maintenance plan which includes making non-metallic cooling stave and BF spraying for NO.2 blast furnace of Jiangsu Xingda Iron & Steel Co., LTD. (XINGDA).


Non-metallic Cooling Stave

The non-metallic cooling stave is designed double ceramic wear resistance cooling module that using industrial water cooling and hold together by bolts between BF throat steel-brick and upper shaft. The cooling stave is casting with ceramic wear resistance castable and has the characters of high strength, wear resistance, erosion resistance, little deformation and long service life. It would help BF burden and gas flow smooth as so to meet the requirement of production and BF long life.

Making the non-metallic cooling stave


Installing water cooling pipe




Installing non-metallic cooling stave


Blast Furnace Sparying

Besides repairing important parts, Huaxi Refractory also make the lining spraying from bosh upward position. To prevent some of lining spalled, a large of wire mesh anchors have been installed on furnace lining. The new lining after spraying is accordance with Party A’s requirement and specification. Now the maintenance plan is in process according to schedule. 


About Us Site Map Service Our Partners Links Inquiry Contact FAQ Privacy Statement Technical Support

Sponsored by: ACRI (The Association of China Refractories Industry), Tangshan YinNaiLian E-Business Co., Ltd.

Copyright © 2005-2020 Refractories Window All Rights Reserved

Tel: +86-315-5918500 Fax: +86-315-5918828 Email: info@refwin.com

ICP经营许可证编号: 冀B2-20060049 ICP备案号: 冀ICP备17015545号

冀公网安备 13024002000198号 营业执照