2017-10-18
Oct. 18, 2017 - In Q3 2017, the total crude steel output increased by
5.9% quarter-on-quarter to 3.5 million tones, primarily following the
completion of capital repairs at EVRAZ DMZ’s oxygen-converter plant and the
ramp-up of EVRAZ Regina after the planned outage in Q2 2017.
Production of steel products, net of re-rolled volumes,
increased by 4.4% quarter-on-quarter to 3.1 million tonnes as a result of
increased output of semi-finished products due to the completion of planned
capital repairs at EVRAZ ZSMK and EVRAZ DMZ.
Production of construction products increased by 6.0%
quarter-on-quarter following a seasonal upturn in demand.
Production of railway products was down 9.8% due to
planned capital repairs at Russian facilities and planned downtime for
maintenance in North America.
Output of flat products decreased by 9.3%
quarter-on-quarter, mostly following a planned maintenance outage in North
America.
In North America, output of tubular products, including large-diameter pipes (LDP), oil country tubular goods (OCTG) and small-diameter line pipes, increased as a result of higher steel availability after a planned outage at EVRAZ Regina and strong demand recovery in OCTG.
Sponsored by: ACRI (The Association of China Refractories Industry), Tangshan YinNaiLian E-Business Co., Ltd.
Copyright © 2005-2020 Refractories Window All Rights Reserved
Tel: +86-315-5918500 Fax: +86-315-5918828 Email: info@refwin.com
ICP经营许可证编号: 冀B2-20060049 ICP备案号: 冀ICP备17015545号