2019-08-20
Aug. 20, 2019 - Australian mineral exploration firm Archer Exploration Limited announced yesterday its maiden exploration target for its South Australia undertaking, the Eyre Peninsula High Purity Alumina (EPHPA) Project.
Archer’s review of historical drill results in the area, which is about 90 miles southeast of Andromeda Metals’ Poochera Project, showed a kaolin exploration target of between 55 million and 130 million metric tons of grade 33 percent to 36 percent.
The EPHPA Project only includes the Kelly Tank and the Bunora kaolin prospects and not other known kaolin outcroppings. Archer notes the site is highly advantageous due to its close proximity to needed infrastructure, including power, water, rail, and roads.
“We have been pleasantly surprised by the recent increase in merger and acquisition activity within the HPA sector,” opined Archer executive chairman Greg English in a press release. “On the Eyre Peninsula we have declared a large HPA Exploration Target that is based on a relatively conservative interpolation of grade and tonnage from historical drill results.”
“The Exploration Target only includes Kelly Tank and Bunora and does not include otherknown kaolin occurrences within the area of Archer’s Eyre Peninsula tenements.”
“The Project is ideally situated close to existing rail, power, gas and other significant infrastructure which will aide further exploration and possible project development,” English concluded. “The development of this potential HPA project is consistent with Archer’s strategy of pursuing opportunities in the reliable energy space.”
Sponsored by: ACRI (The Association of China Refractories Industry), Tangshan YinNaiLian E-Business Co., Ltd.
Copyright © 2005-2020 Refractories Window All Rights Reserved
Tel: +86-315-5918500 Fax: +86-315-5918828 Email: info@refwin.com
ICP经营许可证编号: 冀B2-20060049 ICP备案号: 冀ICP备17015545号